TPW 4/8
Was hoping to be on the TPW 4/1 thread, but am starting a TPW 4/8 thread instead.
SS2 convertible BRM with beige top and interior, rally stripes Polished 20" wheels. 1100, on 3/1 2000, on 3/5 3000, on 3/6 3000 w/ TPW of 4/8, sometime between 3/6 and 3/12 Production complete, 4/11 |
Quote:
2SS RS 1LE |
where do you guys find the TPW
|
Quote:
http://www.camaro5.com/forums/showthread.php?t=31115 |
i right along with you guys in this week. surprised to say these past 23 days have went by pretty quick for me, leaving that i ordered on 2/28.
Summit White 1ss w/npp 1LE anyone already have mods picked out? |
A lesson in patience.
Six to eight week waits were once common place. Now we are spoiled. "Slow" is a week, "quick" is instant download and "normal" is next day. Seems like normal delivery is about 14 days after assembly, depending upon options and weather. |
Glad I did not wait for the 2014...
|
Quote:
|
3400.
Should be good to go next week. |
Show time...
|
Quote:
|
I'm built and bayed boys!! Looks like I was a monday car. I hope you guys make it through this week :)
|
Excellent. Let us know how long it takes from built to dealer lot.
Did you verify through the Chevy website or Becky? |
Quote:
|
All times are GMT -5. The time now is 12:35 AM. |
Powered by vBulletin® Version 3.8.9 Beta 4
Copyright ©2000 - 2024, vBulletin Solutions, Inc.