Thread: G5.R
View Single Post
Old 04-16-2013, 11:01 PM   #71
~ ~'s Avatar
Drives: G5.R
Join Date: Sep 2010
Location: SoCal
Posts: 2,591
Originally Posted by jeremywes View Post
I used PVC pipe, threaded rod and some heat took about 3-5 minutes per bushing
That was a great write up! Thanks for posting. I wish I had seen it before, LOL.

[QUOTE=The Stig;6428945]
Originally Posted by Nathan Moreno View Post
Than ks Frank, I will be shipping it back to you as soon as I get it back from the powder coating.

question Nathan - aren't the hubs covered by the rotors/rotor hats?
RJ you know I'm OCD like that.

Originally Posted by The Stig View Post

Trolling this early stig!? Lol

Cleaning Rear Sub

Here are a few before shots of the sub. All the edges were radius, debured and cleaned up.

Name:  1.jpg
Views: 1811
Size:  56.0 KB

Name:  2.jpg
Views: 1800
Size:  56.4 KB

Name:  3.jpg
Views: 1799
Size:  51.1 KB

Some of this and some of that and......

Name:  4.jpg
Views: 1804
Size:  79.5 KB

After 15 hours of work, she is now pretty clean. All the splatter has been removed, etc......

Name:  5.jpg
Views: 2494
Size:  169.5 KB

After blasting and before powder coating.

Name:  6.jpg
Views: 1798
Size:  52.5 KB
<img src= border=0 alt= /> is offline   Reply With Quote