View Single Post
Old 01-10-2015, 11:42 AM   #157
hammdo
'It's an experiment'
 
hammdo's Avatar
 
Drives: [COTW 2/09/15] '11 GPI LSA SC Z/LE
Join Date: May 2014
Location: Dallas TX
Posts: 8,700
OK, today is Supercharger prep!

Let me start out with this:

IT'S HEAVY!

You'll need a lift to be 100% safe -- Here is what the manual shows:



This is our reference for also drilling out the rivets for the new gaskets.

So first, we want to cover ALL openings -- this includes the intake top and bottom, the rotors, and snout:

You'll also want to make sure the injector openings are covered too! Remember, you'll be drilling out rivets so we want no junk in the intake!

Top of the SC:



Intake ports and injector openings we need to cover:

Injector ports:







Covered:



TB opening on Snout:



OK, so now, I marked the rivets I need to drill out. There are 4 of them (2 on each side):





You'll see on the manifold from ADM, they've already handled the locator dowel pin in the manifold -- if you bought/found your own, you'll need to do what ADM did or buy the drill tool from Lingenfelter.





Now, I'll need to get a proper .125 or smaller (I'll go smaller and work out if I need to) drill bit that is new so I can do a clean job. Would be nice if these clipped in like the Maggie!

That is next!

-Don

Last edited by hammdo; 07-02-2017 at 02:45 PM.
hammdo is offline   Reply With Quote