View Single Post
Old 08-25-2014, 06:00 PM   #2
2013 ZL1 #7860

 
Drives: 2013 ZL1 A6 #7860
Join Date: Apr 2014
Location: CO, USA
Posts: 1,279
Just installed mine this weekend. Took about 1.5 hours. Used a lift though and changed the brake fluid to DOT 4 and bleed the entire system. Works awesome!

I used the hurst and the switchlink and a custom console switch panel. It is slick and very hidden! No leaks either...
2013 ZL1 #7860 is offline   Reply With Quote