Quote:
Originally Posted by RaiderSS
|
We hand built the initial set to test clearances and to finalize the design. Now I am just waiting for samples of actual production pieces from the laser cutter. The wheel reliefs were fairly complicated and give the arm a very unique, stealth bomber, multi-angular look. Since this added more complication to the design and TIG welding requires such a precise fit, the "tweaking" is taking a little longer than normal. We should have some production samples next week to test fit and fixturing. As long as everything fits to our specifications, we could start the production run as early as the 3rd. I am thinking early to mid-October for the product release if there are no problems.