03-12-2011, 12:39 PM
|
#8
|
Drives: 2011 2SS RS SIM Litho # 193
Join Date: Jun 2007
Location: West Hills, CA
Posts: 5,085
|
Quote:
Originally Posted by WMCC Al
12/01/2010 - (1100) Order placed at dealership. Order passed GM edit tables but dealer has not received allocation to place order.
12/01/2010 - (1102) Order entered via web.
12/16/2010 - (2030) Order edited or modified.
12/20/2010 - (2030) Order edited or modified.
02/21/2011 - (2000) Order accepted by GM. Dealer used allocation to place order into production.
02/22/2011 - (2500) Order preferenced. Order pulled to the production system.
02/23/2011 - (3000) Order accepted by production control. Parts being ordered and production process is underway.
03/12/2011 - (3100) Order available to sequence.
03/12/2011 - (3300) Order scheduled for production. Order is scheduled into the plant build cycle.
|
Quote:
Originally Posted by BloodUSMC
I'm in.... 2LT/RS Coupe
|
Quote:
Originally Posted by duckota
I'm in............. 2SS/RS Convert triple black
|
congrats
|
|
|