A few quick updates;
Ben working on the turbocharger system further;
American Muscle (NZ1200) and Japanese Muscle (Nissan Skyline GTR)...
Ben working on the wastegate recirculation tubes...
The turbocharger system dropped down for slip joints to be installed in the wastegate runners. The wastegate runners will see a drastic variety of thermal expansion intervals of intensity and duration, so applying this method of allowed expansion will eliminate the possibility of cracking;
A few shots of the turbocharger system, looking good...
Ben getting started...