Ugh.. Is this bad? Order PKXF9R TPW 3/28
03/19/2011 - (3100) Order available to sequence.
03/19/2011 - (3300) Order scheduled for production. Order is scheduled into the plant build cycle.
03/22/2011 - (3300) Order scheduled for production. Order is scheduled into the plant build cycle.
03/22/2011 - (3100) Order available to sequence.
03/22/2011 - (3100) Order available to sequence.
have becky check it for you , a few other people reported the same , but when she looked it up it was ok, maybe a glitch in the system