View Single Post
Old 08-18-2011, 12:10 PM   #36
Jimbabwe
 
Jimbabwe's Avatar
 
Drives: 2010 IBM 2SS/RS
Join Date: Apr 2010
Location: Elk Grove California
Posts: 310
I would make 6" and trowel contraction joints every 12-15 feet. Concrete will crack, it's about controlling where it does. Placing it in 2 pours would be best in a
checkered pattern.
Planning on putting a gravel layer down as a vapor barrier too?
Jimbabwe is offline   Reply With Quote