So a few weeks ago my dealer said my build date was 4-13-09
Today she told me that i was still @ 3000
she does not know when my car will be built.
How long does it take to sequence through production phases?
She also has not been very good about keeping me up todate with status codes is there any other way to view these other than through the dealer.
(Its the owner that I ordered the car through)
1100 = Preliminary Order:
2000 = Accepted By GM:
2500 = Preferenced:
3000 = Accepted By Production Control:
3100 = Sequenced:
3300 = Scheduled For Production:
3400 = Broadcast:
3800 = Produced:
4150 = Invoiced:
4200 = Shipped:
5000 = Delivered To Dealer:
6000 = Delivered To Customer: