|
- Outside is all buttoned up
- car WAS in the barn for a day or two... but that is back at the shop.... going in for some more HP treatment.
- perlins are going inside the barn now
- started to put in make shift benchs
- moved over a few large metal cabinets.
- the garage doors were a bit of a pain.... still need to find the right automatic garage opener... hopefully one that interfaces with my phone.
- Stairs to the second story are done and reenforced. These are awesome... if you havent seen them... they are reclaimed bleachers from my High School gym.
Next on the Agenda,
- Get the rest of the permits so we can get Gas and Electric in the place
- decide how we are going to insulate. We already have 3 quotes ranging from 4k to 10k. so that is a little discouraging.
- Heading to Green Bay to pick up an 85k BTU furnace for bottom (freebie), already have a 35k btu vertical wall furnace for upstairs
- paint the damn slider
|