01/06/2012 (2000) Order accepted by GM. Dealer used allocation to place order into production.
01/10/2012 (2500) Order preferenced. Order pulled to the production system.
01/10/2012 (3000) Order accepted by production control. Parts being ordered and production process is underway.
01/14/2012 (3100) Order available to sequence.
01/14/2012 (3300) Order scheduled for production. Order is scheduled into the plant build cycle.
01/17/2012 (3100) Order available to sequence.
01/18/2012 (3000) Order accepted by production control. Parts being ordered and production process is underway.
01/27/2012 (3100) Order available to sequence.
01/27/2012 (3300) Order scheduled for production. Order is scheduled into the plant build cycle.
01/30/2012 (3100) Order available to sequence.
01/30/2012 (3300) Order scheduled for production. Order is scheduled into the plant build cycle
This is my sequence of events for January, I am really upset right now. I am getting to the point where I feel like cancelling my order. I was told to remove the b92 and move up in production (lower vin) or risk losing my order, the guys that didn't change their order are passing me up now. If I knew this was going to be the case I would have never changed it.
|