|
Mmm, I'll have to do a few comparisons. Factory vs. aftermarket. IF she ever comes in, I'll defeinitely be posting pix of the before/after. (and quite probably a few "help! I F'd up! notes)
__________________
1100 = Preliminary Order: 5/8/2009
Cancelled by dealer (grr!): 7/2/2009
1100 = 7/16/2009 (awesome new dealer)
2000 = Accepted By GM: 7/25/2009
3000 = Accepted By Production Control: 7/29/2009
3800 = Produced: 8/31/2009
5000 = Delivered To Dealer: 9/14/2009
6000 = Woohoo!!!: 9/15/2009
|