The Auto Shop/Machine Shop/Storage part of the build is 81 deep x 112 wide = 9072 Sq ft.

The Office Area/Man Cave is 56 deep x 26 wide = 1404 sq ft

I finally got the Concrete dust from joint sawing cleaned up this weekend. rented a big rider floor scrubber. Need to get my equipment moved in, get the hoist installed and finish off the Office/Man Cave.

The building was built by Morton Building Systems. I am impressed with their quality and attention to detail. I do not have 1 single complaint about the building. Their insulation package is the best. We had a very cold January below zero most nights and the heating bill was only $187.00. I keep the storage area at 50°, the auto shop and machine shop at 60° and the office at 65°. It is all radiant in floor with Geo Thermal Pumps as the heat source.

I love it...
Wow 10000 sq ft? that's freaking huge
VACamaro is offline   Reply With Quote