|
Usually for us, we wont even schedule the appointment unless we have all of the parts here (even if they're out of stock here and have to be shipped to us). I think the longest install we've ever had here was for a Turbo kit, suspension goodies and a few other things but it was a 2.5 day install. Some Corvette blowers can take a long time w/ meth injection that have a similar time frame but 11 days sounds like a lot unless they didn't have the parts in stock, that would make sense.
|