Quote:
Originally Posted by Number 3
Meant per year, not total. I think the LS7 was originally slated for about 6,000 Z06s per year. So a hand built, high cost LS7 replacement still needs some volume to justify the validation and development costs.
|
Oh ok, that makes sense.
I looked up the C6 Z06 production and it only broke 6k per year for the first 3 years. The 4 remaining years, production dropped into the hundreds.