View Single Post
Old 09-16-2010, 04:07 PM   #155
Jordan
Think Fast.
 
Drives: 2010 National Speed NZ1200 Camaro
Join Date: Aug 2010
Location: Wilmington, NC
Posts: 37
The turbocharger system being permanently installed...





Ben working on wiring in the engine bay...



The anti-froth/oil-return collectors going on...

(the oil collects in these chambers, and is then pulled to the scavenger pump, then returned to the oil pan)









The intake system going together...











The hot-side charge piping in place...



As you can see, nothing routes into the wheel wells, it's all central to the engine bay...



Jordan is offline   Reply With Quote