Started all ready.. Since the first collection of parts sat around for a couple years till I found time. So this time around I'll actually get things done when it's not being driven anyway.
Started with the
Meziere water pump
Just have a idler bracket to finish up on the cnc, since the mounting points are 13 mm thicker than the stock water pump and edelbrock eforce udalized one side of the water pump to mount a idler.
DSS driveshaft and axles
zl1 wheel bearings / hubs
Z28 front control arms and
rear bushings on upper control zl1 springs.
For a little better handling
( I hope)
Linelock
I may change blower pulley for a little more boost (air)
She Still runs a little fat atm.
Frankenstein heads
GM interior light kit
Foot wells and cup holders
Gotta see that coffee cup @ night
lol
Sent from my SM-G930V using Tapatalk