My order went to "Queued for Production" does this mean they are actually building?

Does this mean they are actually building it and I'll have it in a few weeks?
WLNY is offline   Reply With Quote
Old 02-20-2013, 12:52 PM   #2
Steve Dallas
Commits weekly crime
 
Steve Dallas's Avatar
 
Drives: 2017 Camaro 1LT
Join Date: Nov 2009
Location: Camano Island, WA
Posts: 9,513
Out of curiousity, how long has it taken since you ordered the car? I'm starting to look into doing that, and am not sure of the average time from order->delivery.
__________________
2017 Camaro 1LT - Blue Barchetta IV
I fire up the willing engine, responding with a roar. Tires spitting gravel I commit my weekly crime.
Steve Dallas is offline   Reply With Quote
Old 02-20-2013, 12:56 PM   #3
WLNY
 
Drives: ZL1
Join Date: Dec 2012
Location: United States
Posts: 137
I ordered it first week of January I think. For weeks nothing was happening when I checked the chevy website then I happen to check today and it went from ordered placed to current status.
WLNY is offline   Reply With Quote
Old 02-20-2013, 01:21 PM   #4
jbotta

 
jbotta's Avatar
 
Drives: Camaro ZL1
Join Date: Jan 2012
Location: Dyer, IN
Posts: 1,130
I think that is your car build sheet has been put together and is ready for production. It won't be long now, Your car anytime will go to the production line. My 2012 #464 was on the line for about a week, Then once you get by QC and you see that your car is being shipped time seems to stand still until that bad boy is HOME. CONGRATS ON YOUR ZL1
jbotta is offline   Reply With Quote
Old 02-20-2013, 01:33 PM   #5
WLNY
 
Drives: ZL1
Join Date: Dec 2012
Location: United States
Posts: 137
Quote:
Originally Posted by jbotta View Post
I think that is your car build sheet has been put together and is ready for production. It won't be long now, Your car anytime will go to the production line. My 2012 #464 was on the line for about a week, Then once you get by QC and you see that your car is being shipped time seems to stand still until that bad boy is HOME. CONGRATS ON YOUR ZL1
Thanks! Wow that was pretty fast then. I thought because I ordered it with the 10 spoke black rims it would take a lot longer.
WLNY is offline   Reply With Quote
Old 02-20-2013, 01:34 PM   #6
jbotta

 
jbotta's Avatar
 
Drives: Camaro ZL1
Join Date: Jan 2012
Location: Dyer, IN
Posts: 1,130
Quote:
Originally Posted by WLNY View Post
Does this mean they are actually building it and I'll have it in a few weeks?
Your still going to be waiting, production of the car dont take long but Quality CONTROL then shipping seems to take forever.I would say end of march early april you should have your car.
jbotta is offline   Reply With Quote
Old 02-20-2013, 01:41 PM   #7
jbotta

 
jbotta's Avatar
 
Drives: Camaro ZL1
Join Date: Jan 2012
Location: Dyer, IN
Posts: 1,130
Quote:
Originally Posted by WLNY View Post
Thanks! Wow that was pretty fast then. I thought because I ordered it with the 10 spoke black rims it would take a lot longer.
Whats good is all your parts are in and they are setting up the line to build your car, ( all your parts are ready to install thats awesome) It wont be long should hit production any time.
jbotta is offline   Reply With Quote
Old 02-20-2013, 01:47 PM   #8
toddsZL1
 
Drives: 2012 ZL1 IOM#1645
Join Date: Mar 2012
Location: SHAWANO,WI
Posts: 398
I believe it means just scheduled for production, mine took 2 weeks after this to get built and then another two weeks to get shipped.
toddsZL1 is offline   Reply With Quote
Old 02-20-2013, 01:56 PM   #9
WLNY
 
Drives: ZL1
Join Date: Dec 2012
Location: United States
Posts: 137
Quote:
Originally Posted by toddsZL1 View Post
I believe it means just scheduled for production, mine took 2 weeks after this to get built and then another two weeks to get shipped.

That's OK because there's still snow in NY! So I wouldn't mind another month.
WLNY is offline   Reply With Quote
Old 02-20-2013, 02:40 PM   #10
Zikma
 
Zikma's Avatar
 
Drives: ZL1 2012 # 721; 2013 Tahoe Z71
Join Date: Feb 2012
Location: Marshfield, Wisconsin
Posts: 114
This was the timeline for mine
Event Date Event Status
01/25/2012 (1100) Order placed at dealership. Order passed GM edit tables but dealer has not received allocation to place order.
01/25/2012 (1102) Order entered via web.
01/30/2012 (2000) Order accepted by GM. Dealer used allocation to place order into production.
01/31/2012 (2500) Order preferenced. Order pulled to the production system.
01/31/2012 (3000) Order accepted by production control. Parts being ordered and production process is underway.
04/10/2012 (3100) Order available to sequence.
04/10/2012 (3300) Order scheduled for production. Order is scheduled into the plant build cycle.
04/12/2012 (3300) Order scheduled for production. Order is scheduled into the plant build cycle.
04/12/2012 (3100) Order available to sequence.
04/13/2012 (3400) Order Broadcast (internal plant paperwork order produced). Order is sent to various build & supplier areas to bring order together.
04/20/2012 (3800) Order produced and vehicle is being prepared for shipping. For Cadillac, GMC and Buick customers, please contact your dealer or customer service for further updates as no further updates available at this time.
04/20/2012 (4000) Vehicle available to ship.
04/20/2012 (4150) Invoiced (order is invoiced to the dealer).
04/20/2012 (4B00) Your car is bayed and is waiting for transportation by truck, rail or transfer to vendor.
04/26/2012 (4B00) Your car is bayed and is waiting for transportation by truck, rail or transfer to vendor.
04/26/2012 (4200) Shipped (vehicle is shipped to the dealer or interim point of delivery).
05/02/2012 (4B00) Your car is bayed and is waiting for transportation by truck, rail or transfer to vendor.
05/02/2012 (4800) Rail ramp unload. Vehicle has been unloaded from train.
05/07/2012 (4200) Shipped (vehicle is shipped to the dealer or interim point of delivery).
05/07/2012 (5000) Vehicle has been delivered to dealer.
05/11/2012 (6000) Vehicle delivered to customer or dealer has completed customer paperwork.
Zikma is offline   Reply With Quote
Old 02-20-2013, 02:59 PM   #11
WLNY
 
Drives: ZL1
Join Date: Dec 2012
Location: United States
Posts: 137
@Zikma , thanks for posting that, very helpful!
WLNY is offline   Reply With Quote
Old 02-20-2013, 03:38 PM   #12
2Z's4me
 
2Z's4me's Avatar
 
Drives: 2013 Camaro ZL1, 2006 Corvette Z06
Join Date: Jan 2012
Location: San Marcos, California
Posts: 193
Here is my actual workbench report. You are very close and it takes them a week to build the car.
I took delivery of the car on 10/9/12.
Attached Images
File Type: pdf ZL1 Workbench.pdf (19.5 KB, 259 views)
2Z's4me is offline   Reply With Quote
 
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 04:02 PM.


Powered by vBulletin® Version 3.8.9 Beta 4
Copyright ©2000 - 2024, vBulletin Solutions, Inc.