![]() |
|
|
#1 |
![]() Drives: 2011 IBM Camaro 2SS/RS Join Date: Feb 2011
Location: Dayton, OH
Posts: 438
|
Shipment Delays
UPDATE:
Here is the final story for anyone who has been following this thread: My car has FINALLY been delivered to the dealer. Here is the full tracking history: 03/11/2011 Order placed at dealership, deposit paid. 03/15/2011 (1100) Order placed by dealership. Order passed GM edit tables but dealer has not received allocation to place order. 03/15/2011 (1102) Order entered via web. 03/16/2011 (2000) Order accepted by GM. Dealer used allocation to place order into production. 03/16/2011 (2500) Order preferenced. Order pulled to the production system. 03/16/2011 (3000) Order accepted by production control. Parts being ordered and production process is underway. 03/19/2011 (3100) Order available to sequence. 03/19/2011 (3300) Order scheduled for production. Order is scheduled into the plant build cycle. 03/22/2011 (3300) Order scheduled for production. Order is scheduled into the plant build cycle. 03/22/2011 (3100) Order available to sequence. 03/22/2011 (3100) Order available to sequence. 03/26/2011 (3400) Order Broadcast (internal plant paperwork order produced). Order is sent to various build & supplier areas to bring order together. 04/01/2011 (3800) Order produced and vehicle is being prepared for shipping. For Cadillac, GMC and Buick customers, please contact your dealer or customer service for further updates as no further updates available at this time. 04/01/2011 (4000) Vehicle available to ship. 04/01/2011 (4150) Invoiced (order is invoiced to the dealer). 04/01/2011 (4B00) Your car is bayed and is waiting for transportation by truck, rail or transfer to vendor. 05/05/2011 (4200) Shipped (vehicle is shipped to the dealer or interim point of delivery). CSX Tracking: 5/05/2011 – Loaded onto railcar 5/11/2011 – Walkerville, Ontario 5/15/2011 – Detroit, Michigan 5/16/2011 – Walbridge, OH 5/17/2011 – Load departed for Louisville, KY on CSXT 5/17/2011 – Arrived in Louisville, KY 5/18/2011 – Departed for Nashville, TN 5/18/2011 – Arrived in Nashville, TN 5/21/2011 – Empty. Car unloaded in Nashville. 05/21/2011 (4B00) Your car is bayed and is waiting for transportation by truck, rail or transfer to vendor. 05/23/2011 (4200) Shipped (vehicle is shipped to the dealer or interim point of delivery). 05/24/2011 (5000) Vehicle has been delivered to dealer. (Dayton, OH) Original Post: Alright, I've been trying to be patient, but at this point I am getting concerned, and want to see if anyone on here may have insight or information on why my car hasn't shipped. She was built on 4/1/2011 and has been sitting at 4B00 ready to ship since then. I live in Ohio, so this is especially irritating, since the plant is only about six hours away. Oddly enough, someone else from my build week is having the same problem, and he also lives in Ohio. His is a CGM coupe, and mine is an IBM, but I don't think that the paint availability issues should be the problem, since they were both produced over a week ago. Does anyone have any ideas what might be delaying shipment? I already contacted my dealer and Chevy customer service, neither had any real insight. Thanks for any help anyone can provide. Order number if anyone needs it is PNVWH1.
__________________
Last edited by BlueDragonVT; 05-25-2011 at 09:33 AM. |
|
|
|
|
|
#2 |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() Drives: 2013 Triple Black ZL1 Vert M6 ECF Join Date: Mar 2011
Location: Trenton, Michigan
Posts: 7,046
|
Stand in line.
Mine was built back in 3-23 and according to the latest info my dealer says he could get, It's STILL sitting in Osawa. Complete History This page shows the complete history your vehicle has processed. 02/17/2011 - (1102) Order entered via web. 02/17/2011 - (1100) Order placed at dealership. Order passed GM edit tables but dealer has not received allocation to place order. 02/17/2011 - (2000) Order accepted by GM. Dealer used allocation to place order into production. 02/22/2011 - (2500) Order preferenced. Order pulled to the production system. 02/23/2011 - (3000) Order accepted by production control. Parts being ordered and production process is underway. 03/12/2011 - (3100) Order available to sequence. 03/12/2011 - (3300) Order scheduled for production. Order is scheduled into the plant build cycle. 03/15/2011 - (3400) Order Broadcast (internal plant paperwork order produced). Order is sent to various build & supplier areas to bring order together. 03/22/2011 - (3800) Order produced and vehicle is being prepared for shipping. For Cadillac, GMC and Buick customers, please contact your dealer or customer service for further updates as no further updates available at this time. 03/22/2011 - (4000) Vehicle available to ship. 03/22/2011 - (4104) Bailment invoice created (vehicle is about to leave plant property). 03/22/2011 - (4B00) Your car is bayed and is waiting for transportation by truck, rail or transfer to vendor. 03/23/2011 - (4B00) Your car is bayed and is waiting for transportation by truck, rail or transfer to vendor. 03/23/2011 - (4300) Interm transfer. Processing transfer to QC or vendor. 03/23/2011 - (4200) Shipped (vehicle is shipped to the dealer or interim point of delivery). 03/23/2011 - (4B00) Your car is bayed and is waiting for transportation by truck, rail or transfer to vendor. 03/23/2011 - (4300) Interm transfer. Processing transfer to QC or vendor. 03/23/2011 - (4200) Shipped (vehicle is shipped to the dealer or interim point of delivery). 03/24/2011 - (4106) Bailment released (vehicle has left plant property). 03/24/2011 - (4150) Invoiced (order is invoiced to the dealer). Now the response from my dealer yesterday. Tim, This is the response that I have received from the DBC. I will continue to monitor shipping progress for you and keep you updated with any changes in shipping status. I wish that I had more to report to you. Mr. Raby: I am Miguel from DBC OF and I am sending this e mail to tell you that order PMWKN2 13/11 as of 03/23 veh is bayed at Oshawa Canada ready to be shipped to distribution center in New Boston Michigan. Next event code 4200 - Dispatched. As of today, we still do not have any ETAs. If you need any further assistance, please call us back Mariano Miguel/DBC OF/BA Today I sent my dealer an e-mail telling him to go up the chain of commans and find out why it's STILL sitting in Canada. His first reponse... I assure you I will do all I can to provide you with a reason. My only assumption is that it is bayed for Quality Control Inspection. I will find out what I can and get back to you asap. Ok? a later response from the dealer... I think they generate event codes before an event code has been fulfilled. If you look, the event codes are not in sequential order. By date or by code. Codes 4B00, 4200, and 4300 all show on the history list twice for 3-23 and are followed by codes 4106 and 4150 on the 24th. Invoiced to the dealer only means that the invoice has been generated. If you look back at the DBC’s response. They are still showing next code to be 4200. I already explaing that the earlier 4Boo codes were from when it was shipped down the road to get the stripes done and was returned to the plant property. My last e-mail to the dealer was..... The 4B00, 4200, 4300 were when the car was shipped from the plant, down the road to the company that applies the stripes, and was then shipped to the plant. 03/24/2011 - (4106) Bailment released (vehicle has left plant property). Where is it, why is it still there after 2 weeks, what is it waiting for, and when will it move on. I'm now waiting to see what the dealer responds with. |
|
|
|
|
|
#3 |
![]() ![]() ![]() ![]() Drives: 11 IOM 2SS/RS M6 w/Hurst Join Date: Nov 2009
Location: Austin Texas
Posts: 1,269
|
Maybe it is getting an extra QC?
Cheers K |
|
|
|
|
|
#4 |
|
I'm not totally useless..
|
The shipping company that GM contracts to use are/were on strike! This is gonna hold things up...
http://www.camaro5.com/forums/showth...ghlight=allied
__________________
|
|
|
|
|
|
#5 | |
![]() Drives: 2011 IBM Camaro 2SS/RS Join Date: Feb 2011
Location: Dayton, OH
Posts: 438
|
Quote:
__________________
|
|
|
|
|
|
|
#6 |
![]() Drives: 2011 IBM Camaro 2SS/RS Join Date: Feb 2011
Location: Dayton, OH
Posts: 438
|
HDRDTD, sorry to hear that you are in the same boat. All the more reason for us to try to find an answer.
__________________
|
|
|
|
|
|
#7 | |
|
TRIPLE BLACK 2SS/RS VERT
Drives: 1981 Z28 Blue with Blue Stripes Join Date: Oct 2010
Location: NAPLES, FL
Posts: 147
|
Quote:
Don't start complaining, I think that makes them move your car to the back of the line for shipment!!!!!!!!!! It does not help to complain. Sit back and enjoy the forum till your car gets there. My total wait time for my car was 4 1/2 MONTHS. You have nothing to complain about yet.
__________________
TRIPLE BLACK 2SS/RS VERT
HURST SHIFTER ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
|
|
|
|
|
#8 | |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() Drives: 2013 Triple Black ZL1 Vert M6 ECF Join Date: Mar 2011
Location: Trenton, Michigan
Posts: 7,046
|
Quote:
I know I'm probably imaptient as heck just like everybody gets while waiting for their car to be delivered. All they would have to tell me is that it's waiting in line for the next avalible truck-load heading for Detroit. Beside, I think I just got up on the wrong side of the bed this morning God, please grant me patience, and do it NOW!
|
|
|
|
|
|
|
#9 |
![]() Drives: 2011 IBM Camaro 2SS/RS Join Date: Feb 2011
Location: Dayton, OH
Posts: 438
|
__________________
|
|
|
|
|
|
#10 | |
|
I'm not totally useless..
|
Quote:
__________________
|
|
|
|
|
|
|
#11 |
|
Top Down Fun
Drives: 11 2SS/RS IOM Vert Join Date: Jun 2009
Location: Washington Twp, MI
Posts: 457
|
Mine is two days short of four weeks since any update [3/17] on it's status. I can confirm it has stripes already and is just waiting to get shipped.
__________________
2011 Chevrolet Camaro Convertible 2SS RS M6 IOM Vert! IO Interior, Factory Hurst, Painted GFX, Black Rally Stripes, Front/Rear/Bowtie Blackouts, QTP Cutouts, Extra Cupholders!
LED Tails, LED DRL's (always on!), Ghosted "Concept" LED Side Markers, LED Tag Lights, Tinted LED Reverse Lights, Chrome Front Turn Signal Bulbs! My Build Thread Daily Driver: 2016 Ford Fusion Titanium with 2 car seats in the back! |
|
|
|
|
|
#12 |
![]() ![]() ![]() Drives: 2011 2SS Convertible Supercharged Join Date: Nov 2010
Location: WI Cert Welder Navy NSSN
Posts: 1,157
|
mine is sitting too.
This page shows the complete history your vehicle has processed. 02/24/2011 - (1100) Order placed at dealership. Order passed GM edit tables but dealer has not received allocation to place order. 02/24/2011 - (1102) Order entered via web. 02/24/2011 - (2000) Order accepted by GM. Dealer used allocation to place order into production. 03/01/2011 - (2500) Order preferenced. Order pulled to the production system. 03/01/2011 - (3000) Order accepted by production control. Parts being ordered and production process is underway. 03/19/2011 - (3100) Order available to sequence. 03/19/2011 - (3300) Order scheduled for production. Order is scheduled into the plant build cycle. 03/22/2011 - (3300) Order scheduled for production. Order is scheduled into the plant build cycle. 03/22/2011 - (3100) Order available to sequence. 03/22/2011 - (3100) Order available to sequence. 03/24/2011 - (3400) Order Broadcast (internal plant paperwork order produced). Order is sent to various build & supplier areas to bring order together. 03/30/2011 - (3800) Order produced and vehicle is being prepared for shipping. For Cadillac, GMC and Buick customers, please contact your dealer or customer service for further updates as no further updates available at this time. 04/01/2011 - (4000) Vehicle available to ship. 04/01/2011 - (4150) Invoiced (order is invoiced to the dealer). 04/01/2011 - (4B00) Your car is bayed and is waiting for transportation by truck, rail or transfer to vendor. 04/06/2011 - (4300) Interm transfer. Processing transfer to QC or vendor. 04/06/2011 - (4200) Shipped (vehicle is shipped to the dealer or interim point of delivery). 04/06/2011 - (4B00) Your car is bayed and is waiting for transportation by truck, rail or transfer to vendor. 04/06/2011 - (4300) Interm transfer. Processing transfer to QC or vendor. 04/06/2011 - (4200) Shipped (vehicle is shipped to the dealer or interim point of delivery). 04/07/2011 - (4B00) Your car is bayed and is waiting for transportation by truck, rail or transfer to vendor. |
|
|
|
|
|
#13 |
![]() ![]() ![]() ![]() ![]() Drives: 2023 ZLE Join Date: Jun 2009
Location: Detroit
Posts: 1,717
|
I live in Detroit, a few hours closer to Oshawa than you. My car was produced on 3/18/11. It was delivered to my dealer (Rodgers Chevrolet) on 4/7/11. It took a full three weeks to get there. I think it sat in Oshawa for 9 days at 4B00. It was them railed to MI (which took 3 days to get it there and off the rail car) and sat in a rail yard 15 minutes from my dealer for another week +. Yes things have slowed down a bit as a result of the ongoing rerouting from the hauler issue.
|
|
|
|
|
|
#14 |
![]() Drives: 2011 IBM Camaro 2SS/RS Join Date: Feb 2011
Location: Dayton, OH
Posts: 438
|
Thanks for all the responses, everyone. It's good to know that this probably isn't all that unusual. Seeing so many others from my build week ship quickly, and not being able to get any more information than, "it hasn't shipped yet," was making me nervous. I guess I'll just have to be patient and wait it out. :( At least now I'm not worried about my car being stuck in some kind of hiccup in the process.
__________________
|
|
|
|
|
|
|
|
![]() |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| In-Stock and ready for prompt shipment 2010 Camaro Heritage Grille | GmPartsDirect.com | Exterior Parts & Accessories | 1 | 05-24-2010 09:06 PM |
| New shipment arrived today | Chevyrocker | Autos For Sale / Wanted | 0 | 01-19-2010 09:03 AM |
| Shipment Delays... | Camaro_hx | Middle East | 4 | 10-14-2009 11:52 AM |
| no shipment from swiftmotorsports | marcajrfan | Vendor and Seller review / feedback / experiences | 7 | 08-17-2009 05:09 PM |
| Camaro SS manual shipment (not production) hold officially confirmed by GM (UPDATED) | Tran | 5th Gen Camaro SS LS LT General Discussions | 715 | 07-24-2009 12:05 AM |